Editing the Footprint of an existing Building or Zone is similar to the initial creation process with a few simple additional steps and rules.
Select the Item you wish to Edit (based on the rules outlined below)
Click the Edit button on the Edit Toolbar
A series of Strokes are created based on the existing item Footprint.
Edit these Strokes in the same way as you originally sketched the item. You can add/erase stokes using the eraser/squiggle.
Once you have sketched the new Footprint click the Accept button in the Edit Toolbar.
[You can use the Reject button to cancel the update and remove the Strokes]
Updating Building Footprints
When updating Building Footprints the following rules apply as to how the new Footprint is assigned to the Building.
- With the Building selected, and the Working Level equal to the Base of the Building, the updated Footprint will be applied to the entire Building
- With the Building selected and the Working Level not-equal to the Base of the Building, the updated Footprint will be applied to the Building from the Working Level upwards, ie the Building Footprint will change at the current Working Level
- With an individual Level selected, the updated Footprint will apply to that individual Level